Phone: (314) 664-0608
Major Repairs
  • Replacement of Parking lot - Estimated at $70,000.00
  • Repair and replace water line to the parsonage/office portion of the property
  • Tuck-pointing spots around the building
  • Replacement of retaining wall leading down to the fellowship hall from the parking lot
  • Repair/Replacement of Retaining wall to the flower bed outside of the parsonage near entrance to daycare
  • Repair/Replace concrete pad leading to handicap accessible entrance of the annex that allows concrete to meet the threshold of the door for wheelchair access
  • Replace grand staircase entrance doors for both beauty and security of the building.
  • Replace parking lot main entrance door/s to meet fire code and handicap standards